Skip to main content

Complete track rebuild

Short Line 101 Track Rebuild

The Western Development Museum credits Ironhorse for rebuilding the track supporting Saskatchewan's only operating steam locomotive experience.

New rail and ties during track construction
Ironhorse crews and equipment on similar railway work. Not a photograph of this project.

The operating challenge

Returning the historic Short Line 101 to operation required its rail bed to be taken down and rebuilt with new material before the locomotive and passenger cars could safely return.

Published project details

Rail bed removal and reconstruction
New track materials
Support for a heritage passenger operation
Delivery completed before winter conditions

The delivery outcome

The museum thanks Ironhorse for the track rebuild, and a contemporary local account reports that the old rail bed was taken down to ground level and rebuilt with new materials. Construction was completed in October 2017.

Published details are taken from the linked independent record.

Planning a similar project?

For heritage or passenger railway work, discuss track condition, gauge, public access, operating dates, and the owner's inspection and acceptance requirements.

Request a bid

What to bring to a similar project

Planning considerations for a new brief, based on the type of work documented here.

  • State the actual track gauge and operating requirements when preparing a heritage railway brief.
  • Coordinate public access and operating dates with the owner before selecting construction windows.
  • Confirm the applicable inspection, qualification, and acceptance requirements for the particular railway.
Frame a track repair or replacement decision
Project facts and source record

The project at a glance

Owner
Western Development Museum
Location
Moose Jaw, Saskatchewan
Railway
K+S Potash Canada Short Line 101
Documented work
Track rebuild credited to Ironhorse by the museum

The documented record

  1. 2017

    Track reconstruction

    The published rebuild account describes removal of the old rail bed and reconstruction with new materials, completed in October 2017.

  2. Owner acknowledgement

    Supporting a heritage railway

    The museum credits Ironhorse's track-rebuilding work in the history of its Short Line 101 passenger operation.