New Track Construction

Industrial spurs, yard tracks, and loop tracks built from sub-ballast through commissioning.

Aerial view of new railway track construction in Western Canada

A complete field scope.

Ironhorse builds new industrial railway track across Alberta, British Columbia, and Saskatchewan. Work covers sub-ballast, ballast, ties, rail, turnouts, surfacing, and pre-service inspection for spurs, yards, loops, and mainline connections.

Planning a new spur or yard? Start with the owner’s guide
Industrial spurs, yard tracks, and grain loops
Sub-ballast, drainage, and ballast placement
Turnout supply and installation
Continuous welded and jointed rail construction
Final surfacing and geometry verification

How the work moves.

Plan the build

Confirm standards, access, civil readiness, material staging, and the operating window.

Install the track

Coordinate subgrade, ballast, ties, rail, turnouts, welding, and production equipment.

Commission safely

Surface, inspect, document, and support the railway or owner through acceptance.

Equipment matched to scope

  • MKIV production tampers
  • Ballast regulators
  • Hi-rail excavators
  • Boom trucks
  • Loaders and transport fleet

Common questions

Answers drawn from Ironhorse's published information and standard railway practice. Project specifics are confirmed in the bid.

What does Ironhorse need to quote a new spur or yard track?

A site plan or drawing, the connection point and serving railway, intended car types and traffic, the civil status of the subgrade, and target dates. Ironhorse can help define the rest, including turnout sizes, rail section, and construction sequencing.

Does Ironhorse handle the civil work?

Track construction starts at the prepared subgrade. Ironhorse coordinates with the civil contractor on sub-ballast readiness and drainage, then delivers ballast, ties, rail, turnouts, surfacing, and inspection. On the Coaldale industrial spur, the public record names Ironhorse alongside a separate civil contractor.

How long does industrial track construction take?

Track work for a spur of a kilometre or two is often measured in weeks once the subgrade is ready and materials are staged. The serving railway agreement, design approval, and civil work usually take longer than the track itself.